Case Info Sheet
APPROVED
274-SA-2021
SVE REMEDIATION SYSTEM
SVE REMEDIATION SYSTEM
Request
Request to install fencing around a temporary soil vapor extraction (SVE) remediation system along the eastern exterior side of the suite/building.
Request to install fencing around a temporary soil vapor extraction (SVE) remediation system along the eastern exterior side of the suite/building.
Please return to this page for periodic updates.
Coordinator
Desirae Mayo
Desirae Mayo
Contact Information
The preceding data provides general information only.
For additional information about this application, please contact Current Planning at 480-312-7767 or click the link below to send an email.
Please mention the specific case number when calling or e-mailing.